Bugfixes
- [Bugfix] The synchronisation handler could in rare cirumstances run into a deadlock preventing any further syncing between instances
- [Bugfix] Deleting whole folders in the library could have physically deleted only half of the containing files. This in turn could have led to issues when playback of these remaining files still worked but the files were not present in the library.
- [Bugfix] Reruns in the rundown could have caused an internal exception in some circumstances
- [Bugfix] Ad triggers pre-configured in the rundown in some cases were still executed while Breaking Live was active
- [Bugfix] The information that a live stream input was a local / listener live stream could have been lost with the update to v9.7.x. This would have turned the live streams into non functioning pull live streams. This bugfix also restores the previous state of these broken live streams.
Documentation
For detailed product documentation, please refer to the following location:
https://ltnglobal.zendesk.com/hc/en-us/categories/1500000177442-Schedule
System Characteristics
View the full system characteristics here:
https://ltnglobal.zendesk.com/hc/en-us/articles/1500006970362-System-Characteristics-Schedule
Known Issues and/or Limitations
| Deletion of rundown elements | Deleting more than 2,000 assets in the rundown at once does not work. |
| Moving assets into folders in asset-library |
When the designated folder is expanded, items cannot be dropped into this folder. |
| PGM Preview can show grey image when interlaced source files are used |
It sometimes can happen, depending on several factors, that the PGM preview shows a grey image but the actual output is fine. |
For the previously known issues and their fixed versions: https://ltnglobal.zendesk.com/hc/en-us/articles/1500002027841-Release-Notes-Changelog-Schedule