Upcoming release, planned to be available beginning of April
Resolved Defects List / Improvements
- [Bugfix] Insertion of sequences or pasting multiple elements could result in incomplete insertion
- [Bugfix] Coming up next overlay was showing the wrong title when not skipped
- [Bugfix] Remotely pulled livestreams might have continued to be pulled even though they were not in use anymore when the element ended as scheduled
- [Bugfix] Due to internal adjustments, locked items could overlap with the element before which prevented any changes to the locked element
- [Bugfix] Times in an existing rundown could shift after an update to a newer version
- [Changed] Reduced amount of status requests to Youtube while publishing. Current amount of viewers will now be up to 1 hour old. This change is necessary to keep the API connection functioning.
Documentation
For a detailed product documentation, please refer to the following location:
https://ltnglobal.zendesk.com/hc/en-us/categories/1500000177442-Schedule
System Characteristics
Please view the full system characteristics here:
https://ltnglobal.zendesk.com/hc/en-us/articles/1500006970362-System-Characteristics-Schedule
Known Issues and/or Limitations
| MPEG-TS Muxing Overhead |
Because of vbv-buffer compatibility the muxer overhead is set to 80%. This result of this is an overall increased bitrate of 80%, in regards to the configured video bitrate within LTN-Schedule transcoding settings. For example: 10MBit configured within the Schedule UI will result in 18MBit MPEG-TS muxed stream output on the actual MPEG-TS Output (SRT). RTMP and HLS Targets are not affected by that. LTN continues improving this component to reduce the overhead in upcoming updates. |
| Deletion of rundown elements | Deleting more than 2000 assets in the rundown at once does not work. |
| Library bulk delete problems | Deleting more than 500 Assets of the Library can slow down the system. |
| Starting Playback during an ad-break issue |
Starting Playback during an ad-break can cause the current video element to skip to the next one too early when the backup video is overall shorter than the ad-break itself. |
| Control View |
Control View is currently not fully functioning |
| Dropping folder/sequence over gap in calendar view |
Dropping a whole folder or sequence element from the library onto a gap in the calendar view will not place the element in the rundown at all |
| Calendar View |
If browser height is twice the initial zoom level, the whole view is not properly functioning. Zooming in a level will fix it. |
| HLS Pull |
Full HLS pull URL will only be shown, after a newly created pull target has been modified. |
For the previously known issues and their fixed versions: https://ltnglobal.zendesk.com/hc/en-us/articles/1500002027841-Release-Notes-Changelog-Schedule